{"id":6666,"date":"2026-10-10T19:26:39","date_gmt":"2026-10-10T17:26:39","guid":{"rendered":"https:\/\/www.bm4u.cz\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/"},"modified":"2026-10-10T19:59:28","modified_gmt":"2026-10-10T17:59:28","slug":"the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance","status":"publish","type":"post","link":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/","title":{"rendered":"How We Increased Production Performance in 12 Months Without Building a&nbsp;New Facility, Buying New Machines or Hiring Additional Staff"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>The greatest opportunities for improvement were not in the machines. They lay in the connections between sales, planning, production, quality and maintenance.<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">In 2025, the company had annual revenue of approximately CZK 1.2 billion, more than 450 employees and a&nbsp;multi-shift production operation. Orders were plentiful, and the shop floor was busy. Machines were fully utilised, and employees were working overtime. Yet the same problems kept recurring. Customer orders were not delivered on time. Quality was inconsistent. Production schedules were constantly revised, and warehouses were filled with work in progress.<\/p>\n\n<p class=\"wp-block-paragraph\">The maintenance team was dealing with breakdowns almost continuously. Meanwhile, management was increasingly considering an investment of approximately CZK 150 million in a&nbsp;new production hall and additional equipment. The reasoning was straightforward: production could not keep up, so more capacity was needed.<\/p>\n\n<p class=\"wp-block-paragraph\">The owner was convinced that the company had reached its production limits. To continue growing, it would need a&nbsp;new production hall, more machines, an additional shift and more employees.<\/p>\n\n<p class=\"wp-block-paragraph\">In other words, the problem was seen as a&nbsp;lack of production capacity. Unfortunately, many Czech manufacturing companies take the same view.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Sufficient capacity but inefficient use<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">At the start of our engagement, we conducted a&nbsp;detailed analysis of the company\u2019s production operations. The findings were surprising. The company was not suffering from a&nbsp;capacity shortage. The problem lay in how it used its existing capacity.<\/p>\n\n<p class=\"wp-block-paragraph\">The analysis revealed that many of the issues did not originate on the shop floor. They arose weeks or even months before production began. The sales team relied on inaccurate demand forecasts, and production was often based on anticipated future demand.<\/p>\n\n<p class=\"wp-block-paragraph\">Customers would subsequently change product specifications, delivery dates or order volumes. Products remained in stock while production needed capacity for new orders. Frequent changes in priorities, constant rescheduling, production line changeovers and growing volumes of work in progress compounded the problem. The result was a&nbsp;paradox: production was fully loaded, yet the company still felt it lacked sufficient capacity.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>Many of the problems originated outside production<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">Another surprising finding was that some of the issues management viewed as production problems did not originate in production at all. They arose at the interfaces between sales, planning and production. Sales wanted to accommodate the customer. Production wanted to plan efficiently. Customers changed their priorities. The entire system was constantly adjusting..<\/p>\n\n<p class=\"wp-block-paragraph\">As a&nbsp;result:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>work in progress increased,<\/li>\n\n\n\n<li>unnecessary changeovers were required,<\/li>\n\n\n\n<li>inventory levels rose,<\/li>\n\n\n\n<li>overtime increased,<\/li>\n\n\n\n<li>productivity declined.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\"><strong>Maintenance was not managing production reliability<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">The maintenance team was working hard. However, most of its time was spent dealing with the consequences of failures. A&nbsp;machine broke down. Maintenance responded. The machine was repaired. Production resumed. Days or weeks later, the same pattern repeated. There was no effective system for managing production reliability. Reactive maintenance prevailed over a&nbsp;structured maintenance approach. Every breakdown meant:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>downtime,<\/li>\n\n\n\n<li>scrap,<\/li>\n\n\n\n<li>overtime,<\/li>\n\n\n\n<li>pressure on delivery deadlines,<\/li>\n\n\n\n<li>stress on the shop floor.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\"><strong>From analysis to meaningful change<\/strong><\/p>\n\n<p class=\"wp-block-paragraph\">The analysis identified the problems. Someone had to take responsibility for resolving them. The owner therefore engaged three managers through BM4U.<\/p>\n\n<p class=\"wp-block-paragraph\">Commercial Director<\/p>\n\n<p class=\"wp-block-paragraph\">The Commercial Director focused on improving the consistency and accuracy of demand forecasts, aligning sales with production and reducing production for stock without confirmed demand.<\/p>\n\n<p class=\"wp-block-paragraph\">Production Director<\/p>\n\n<p class=\"wp-block-paragraph\">The Production Director was tasked with increasing productivity within existing capacity, eliminating the main causes of downtime, stabilising quality and establishing a&nbsp;structured maintenance system.<\/p>\n\n<p class=\"wp-block-paragraph\">Transformation and Digitalisation Manager<\/p>\n\n<p class=\"wp-block-paragraph\">The Transformation and Digitalisation Manager led the transformation programme, preparations for ERP implementation, production data collection, process automation and the initial deployment of AI in production planning and management.<\/p>\n\n<p class=\"wp-block-paragraph\">What we changed over 12 months<\/p>\n\n<p class=\"wp-block-paragraph\">First, we stabilised planning. Production stopped relying on estimates and began responding to customers\u2019 actual requirements. We then introduced a&nbsp;structured maintenance system.<\/p>\n\n<p class=\"wp-block-paragraph\">We began tracking the root causes of breakdowns rather than just the breakdowns themselves. We established procedures for scheduling maintenance shutdowns, managing critical spare parts and systematically reviewing recurring issues.<\/p>\n\n<p class=\"wp-block-paragraph\">At the same time, we focused on quality. Instead of simply handling customer complaints, we analysed the causes of scrap, failures to follow process requirements and non-compliance with standards.<\/p>\n\n<p class=\"wp-block-paragraph\">Once the processes had been stabilised, we launched the first phase of digitalisation and AI adoption. AI primarily supported demand forecasting, production planning, downtime analysis and reporting.<\/p>\n\n<p class=\"wp-block-paragraph\">Results after 12 months<\/p>\n\n<p class=\"wp-block-paragraph\">After a&nbsp;year of working together, the company had:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>not built a&nbsp;new production hall,<\/li>\n\n\n\n<li>not purchased new core production equipment,<\/li>\n\n\n\n<li>not hired dozens of additional employees.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">Nevertheless, it achieved the following results:<\/p>\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Metric<\/strong><\/td><td><strong>Before the transformation<\/strong><\/td><td><strong>After 12 months<\/strong><\/td><\/tr><tr><td>On-time delivery<\/td><td>78&nbsp;%<\/td><td>96&nbsp;%<\/td><\/tr><tr><td>Unplanned downtime<\/td><td>Baseline<\/td><td>-45&nbsp;%<\/td><\/tr><tr><td>Scrap rate<\/td><td>6,5&nbsp;%<\/td><td>3,2&nbsp;%<\/td><\/tr><tr><td>Work-in-progress inventory<\/td><td>CZK 90 million<\/td><td>CZK 55 million<\/td><\/tr><tr><td>Production for stock<\/td><td>Baseline<\/td><td>-40&nbsp;%<\/td><\/tr><tr><td>Overtime<\/td><td>Baseline<\/td><td>-35&nbsp;%<\/td><\/tr><tr><td>Need for a&nbsp;new production hall<\/td><td>Planned investment of CZK 150 million<\/td><td>Investment deferred<\/td><\/tr><tr><td>Annual financial benefit<\/td><td>&#8211;<\/td><td>Approx. CZK 48 million<\/td><\/tr><\/tbody><\/table><\/figure>\n\n<p class=\"wp-block-paragraph\">The results did not come from a&nbsp;single breakthrough project. The annual benefit came from a&nbsp;combination of:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>lower scrap rates,<\/li>\n\n\n\n<li>reduced downtime,<\/li>\n\n\n\n<li>less overtime,<\/li>\n\n\n\n<li>lower work-in-progress inventory,<\/li>\n\n\n\n<li>better capacity utilisation,<\/li>\n\n\n\n<li>more accurate planning.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">The transformation programme continues. ERP implementation is underway, and the use of AI is expanding.<\/p>\n\n<p class=\"wp-block-paragraph\">Predictive maintenance is being prepared, and production planning is being automated. As with previous projects, the objective is not a&nbsp;one-off saving. It is a&nbsp;sustained improvement in the performance of the entire company.<\/p>\n\n<p class=\"wp-block-paragraph\">What business owners should take away<\/p>\n\n<p class=\"wp-block-paragraph\">Many manufacturing companies address the symptoms. They buy new machines, build new production halls and then hire more employees.<\/p>\n\n<p class=\"wp-block-paragraph\">Yet the underlying problem often lies elsewhere:<\/p>\n\n<ul class=\"wp-block-list\">\n<li>in demand forecasting,<\/li>\n\n\n\n<li>in planning,<\/li>\n\n\n\n<li>in production for stock,<\/li>\n\n\n\n<li>in downtime,<\/li>\n\n\n\n<li>in maintenance,<\/li>\n\n\n\n<li>in quality.<\/li>\n<\/ul>\n\n<p class=\"wp-block-paragraph\">It also lies in the lack of coordination between departments. Successful companies therefore do&nbsp;not manage production as a&nbsp;standalone department. They manage sales, planning, production, quality, maintenance and logistics together as one integrated system. Only then do&nbsp;they discover how much capacity they had available all along.<\/p>\n\n<p class=\"wp-block-paragraph\"><strong>The greatest opportunities for improvement were not in the machines. They lay in the connections between sales, planning, production, quality and maintenance.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The greatest opportunities for improvement were not in the machines. They lay in the connections between sales, planning, production, quality and maintenance. In 2025, the company had annual revenue of approximately CZK 1.2 billion, more than 450 employees and a&nbsp;multi-shift production operation. Orders were plentiful, and the shop floor was busy. Machines were fully utilised, [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":5027,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"off","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[92,75,90,77],"tags":[],"class_list":["post-6666","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noninterim-management","category-development","category-news","category-other"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How We Increased Production Performance in 12 Months Without Building a New Facility, Buying New Machines or Hiring Additional Staff - BM4U | business managers<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How We Increased Production Performance in 12 Months Without Building a New Facility, Buying New Machines or Hiring Additional Staff - BM4U | business managers\" \/>\n<meta property=\"og:description\" content=\"The greatest opportunities for improvement were not in the machines. They lay in the connections between sales, planning, production, quality and maintenance. In 2025, the company had annual revenue of approximately CZK 1.2 billion, more than 450 employees and a&nbsp;multi-shift production operation. Orders were plentiful, and the shop floor was busy. Machines were fully utilised, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/\" \/>\n<meta property=\"og:site_name\" content=\"BM4U | business managers\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-10T17:26:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-10T17:59:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.bm4u.cz\/wp-content\/uploads\/2024\/09\/BM4U-web-027.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2000\" \/>\n\t<meta property=\"og:image:height\" content=\"1125\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"BM4U\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"BM4U\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/\"},\"author\":{\"name\":\"BM4U\",\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/#\\\/schema\\\/person\\\/30fe0ebdda810ed2bdadf8b9bff74fdc\"},\"headline\":\"How We Increased Production Performance in 12 Months Without Building a&nbsp;New Facility, Buying New Machines or Hiring Additional Staff\",\"datePublished\":\"2026-10-10T17:26:39+00:00\",\"dateModified\":\"2026-10-10T17:59:28+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/\"},\"wordCount\":1011,\"publisher\":{\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.bm4u.cz\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/BM4U-web-027.jpg\",\"articleSection\":[\"(Non)Interim management\",\"DEVELOPMENT\",\"News\",\"Other\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/\",\"url\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/\",\"name\":\"How We Increased Production Performance in 12 Months Without Building a New Facility, Buying New Machines or Hiring Additional Staff - BM4U | business managers\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.bm4u.cz\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/BM4U-web-027.jpg\",\"datePublished\":\"2026-10-10T17:26:39+00:00\",\"dateModified\":\"2026-10-10T17:59:28+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.bm4u.cz\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/BM4U-web-027.jpg\",\"contentUrl\":\"https:\\\/\\\/www.bm4u.cz\\\/wp-content\\\/uploads\\\/2024\\\/09\\\/BM4U-web-027.jpg\",\"width\":2000,\"height\":1125,\"caption\":\"2075069920\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Dom\u016f\",\"item\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"How We Increased Production Performance in 12 Months Without Building a&nbsp;New Facility, Buying New Machines or Hiring Additional Staff\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/\",\"name\":\"BM4U | business managers\",\"description\":\"Mana\u017ee\u0159i pro v\u00e1s\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/#organization\",\"name\":\"BM4U s.r.o.\",\"url\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.bm4u.cz\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/BM4U-logo-web.png\",\"contentUrl\":\"https:\\\/\\\/www.bm4u.cz\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/BM4U-logo-web.png\",\"width\":457,\"height\":166,\"caption\":\"BM4U s.r.o.\"},\"image\":{\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/bm4u-cz\\\/\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/#\\\/schema\\\/person\\\/30fe0ebdda810ed2bdadf8b9bff74fdc\",\"name\":\"BM4U\",\"url\":\"https:\\\/\\\/www.bm4u.cz\\\/en\\\/author\\\/romana\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How We Increased Production Performance in 12 Months Without Building a New Facility, Buying New Machines or Hiring Additional Staff - BM4U | business managers","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/","og_locale":"en_US","og_type":"article","og_title":"How We Increased Production Performance in 12 Months Without Building a New Facility, Buying New Machines or Hiring Additional Staff - BM4U | business managers","og_description":"The greatest opportunities for improvement were not in the machines. They lay in the connections between sales, planning, production, quality and maintenance. In 2025, the company had annual revenue of approximately CZK 1.2 billion, more than 450 employees and a&nbsp;multi-shift production operation. Orders were plentiful, and the shop floor was busy. Machines were fully utilised, [&hellip;]","og_url":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/","og_site_name":"BM4U | business managers","article_published_time":"2026-10-10T17:26:39+00:00","article_modified_time":"2026-10-10T17:59:28+00:00","og_image":[{"width":2000,"height":1125,"url":"https:\/\/www.bm4u.cz\/wp-content\/uploads\/2024\/09\/BM4U-web-027.jpg","type":"image\/jpeg"}],"author":"BM4U","twitter_card":"summary_large_image","twitter_misc":{"Written by":"BM4U","Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/#article","isPartOf":{"@id":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/"},"author":{"name":"BM4U","@id":"https:\/\/www.bm4u.cz\/en\/#\/schema\/person\/30fe0ebdda810ed2bdadf8b9bff74fdc"},"headline":"How We Increased Production Performance in 12 Months Without Building a&nbsp;New Facility, Buying New Machines or Hiring Additional Staff","datePublished":"2026-10-10T17:26:39+00:00","dateModified":"2026-10-10T17:59:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/"},"wordCount":1011,"publisher":{"@id":"https:\/\/www.bm4u.cz\/en\/#organization"},"image":{"@id":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bm4u.cz\/wp-content\/uploads\/2024\/09\/BM4U-web-027.jpg","articleSection":["(Non)Interim management","DEVELOPMENT","News","Other"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/","url":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/","name":"How We Increased Production Performance in 12 Months Without Building a New Facility, Buying New Machines or Hiring Additional Staff - BM4U | business managers","isPartOf":{"@id":"https:\/\/www.bm4u.cz\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/#primaryimage"},"image":{"@id":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/#primaryimage"},"thumbnailUrl":"https:\/\/www.bm4u.cz\/wp-content\/uploads\/2024\/09\/BM4U-web-027.jpg","datePublished":"2026-10-10T17:26:39+00:00","dateModified":"2026-10-10T17:59:28+00:00","breadcrumb":{"@id":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/#primaryimage","url":"https:\/\/www.bm4u.cz\/wp-content\/uploads\/2024\/09\/BM4U-web-027.jpg","contentUrl":"https:\/\/www.bm4u.cz\/wp-content\/uploads\/2024\/09\/BM4U-web-027.jpg","width":2000,"height":1125,"caption":"2075069920"},{"@type":"BreadcrumbList","@id":"https:\/\/www.bm4u.cz\/en\/the-greatest-opportunities-for-improvement-were-not-in-the-machines-they-lay-in-the-connections-between-sales-planning-production-quality-and-maintenance\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Dom\u016f","item":"https:\/\/www.bm4u.cz\/en\/"},{"@type":"ListItem","position":2,"name":"How We Increased Production Performance in 12 Months Without Building a&nbsp;New Facility, Buying New Machines or Hiring Additional Staff"}]},{"@type":"WebSite","@id":"https:\/\/www.bm4u.cz\/en\/#website","url":"https:\/\/www.bm4u.cz\/en\/","name":"BM4U | business managers","description":"Mana\u017ee\u0159i pro v\u00e1s","publisher":{"@id":"https:\/\/www.bm4u.cz\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.bm4u.cz\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.bm4u.cz\/en\/#organization","name":"BM4U s.r.o.","url":"https:\/\/www.bm4u.cz\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.bm4u.cz\/en\/#\/schema\/logo\/image\/","url":"https:\/\/www.bm4u.cz\/wp-content\/uploads\/2022\/04\/BM4U-logo-web.png","contentUrl":"https:\/\/www.bm4u.cz\/wp-content\/uploads\/2022\/04\/BM4U-logo-web.png","width":457,"height":166,"caption":"BM4U s.r.o."},"image":{"@id":"https:\/\/www.bm4u.cz\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/bm4u-cz\/"]},{"@type":"Person","@id":"https:\/\/www.bm4u.cz\/en\/#\/schema\/person\/30fe0ebdda810ed2bdadf8b9bff74fdc","name":"BM4U","url":"https:\/\/www.bm4u.cz\/en\/author\/romana\/"}]}},"_links":{"self":[{"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/posts\/6666","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/comments?post=6666"}],"version-history":[{"count":3,"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/posts\/6666\/revisions"}],"predecessor-version":[{"id":6672,"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/posts\/6666\/revisions\/6672"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/media\/5027"}],"wp:attachment":[{"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/media?parent=6666"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/categories?post=6666"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.bm4u.cz\/en\/wp-json\/wp\/v2\/tags?post=6666"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}